IID Water Department









Local Entity

QSA

Fallowing

Definite Plan

Cutout Schedule

Equitable Distribution

2006 Water Use

All American Canal Lining Project / Back
Water Department- Water Conservation -


Authorized and constructed pursuant to the Boulder Canyon Project Act, the All-American Canal (AAC) is operated and maintained by the Imperial Irrigation District (IID) under a contract with the United States Bureau of Reclamation  (USBR). The AAC is currently unlined, resulting in substantial losses to seepage. The All-American Canal Lining Project (Project) will result in the concrete lining of 23 miles of the unlined AAC.

The Project consists of the planning; environmental compliance and permitting activities; preparation of schedules, plans, specifications and cost estimates; administration; design; construction; and implementation of environmental mitigation measures required to construct a 23-mile concrete lined canal parallel to the existing earthen canal, from one mile west of Pilot Knob to Drop 3. The new concrete lined section of the AAC will result in the conservation of 67,700 acre-feet per year of Colorado River water currently lost to seepage.

The new section of concrete lined AAC will be constructed parallel to the existing AAC alignment using conventional construction methods and will permit the current unlined section of the AAC to remain in service and to provide normal water deliveries to IID customers during construction. Upon completion of the Project, IID will operate and maintain the Project in accordance with its existing contract with USBR.

_________________________________________________________

AACLP Construction Monthly Progress Report - February 2008

AACLP Construction Monthly Progress Report - January 2008

AACLP Construction Monthly Progress Report - December 2007

AACLP Construction Monthly Progress Report - November 2007

AACLP Construction Monthly Progress Report - October 2007

AACLP Construction Monthly Progress Report - September 2007

AACLP Construction Monthly Progress Report - August 2007

AACLP Construction Monthly Progress Report - July 2007

AACLP Construction Monthly Progress Report - June 2007 

AACLP Construction Monthly Progress Report - September 2006 

AACLP Construction Monthly Progress Report - August 2006

AACLP Construction Monthly Progress Report - July 2006

All American Canal

AACLP Project Map


Pages: 1





© 2006 Imperial Irrigation District | Economic Development | Contact Us | FAQ | Privacy Policy | Terms of Use