Non-Residential Rebates

Print

It Pays to be Energy Efficient

Products must be purchased and installed in 2019 in order to qualify for a rebate. Rebates are not guaranteed and are available on a first-come, first-served basis. This program may be modified without prior notice. Please refer to the Energy Rewards Program Guidelines for more information.

 

How to Apply

Read the terms and conditions of the program.

  1. Purchase and install qualifying product(s) between January 1, 2019, and December 31, 2019 (see list below).
  2. Submit your completed application, proof of purchase and other supporting documentation within 90 days of the purchase date and/or by December 31, 2019, (whichever occurs first) as rebates are limited and awarded on a first-come, first-served basis.

Rebate Forms

3 Ways to Submit Your Rebate Application

  • Mail
    IID Rebate Processing Center
    P. O. Box 937
    Imperial, CA 92251
  • Email
    EnergyRewards@iid.com
  • Fax
    1-760-482-3359

Product / Service

Rebate

Requirements

Programmable Thermostat

 

$50/ unit

Thermostat must meet Title 24 requirements and have the ability to automatically adjust the temperature setting of the heating and cooling system at pre-selected times.

Vending Miser

 

$80 / unit

Vending Misers reduce the energy consumption of vending machines by using an occupancy sensor to power down the lights and compressor. A temperature sensor powers the machine back up as needed to keep items at the appropriate temperature.

Package Terminal Air Conditioners and Heat Pumps (PTACs)

 

$50 / ton

Units must have an EER of ≥ 10.9.

EER – High Temperature Rating

Energy Efficient Motors

 

$35 - $1260 / ton

Motors covered under this program must be new three-phase induction motors, NEMA Design A and B from at least 1 HP in size to 200 HP ODP or TEFC motors with 1200, 1800 or 3600 RPM and operate at least for 2000 hours per year. These motors are used for HVAC fans, pumping and conveyance applications and are based on California’s Title 24 standards. The minimum nominal full-load motor efficiencies and incentives for the permanently wired, three-phase motors are listed in the Energy Rewards Guidelines at www.iid.com.

HVAC System

 

 

Unit

Size

Tier

SEER

EER

HSPF

Split

Package

Split

Package

Split

Package

Tier 1: $125 / ton

 

 

≤ 5 Tons

1

15

≥15

≥12.5

≥12

8.5

8

Tier 2: $200 / ton

2

≥16

≥16

≥12.5

≥12

8.5

8

Tier 3: $300 / ton

3

≥17

 

≥12.5

 

8.5

 

˃ 5 Tons

 

Split and Packaged Units - ≥ 20 Tons, 10.5 EER

AHRI certificate required for each model installed. Must meet SEER, EER and/or HSPF as indicated. If not self-installing unit, installation must be performed by a contractor on IID’s Participating Contractor List at www.iid.com/ParticipatingContractors. Tiers 1, 2 and 3 apply to systems that are 5 tons or less and 65,000 BTU/Hr and below.

Program Limitations and Requirements

  • Existing buildings only. Rebates are only available for existing buildings. New construction does not qualify.
  • Limited funding. Rebates are limited, not guaranteed and may be terminated without prior notice. Non-residential rebates are capped at $10,000 annually per customer account.
  • Self-installation. Customers that self-install products do not need to work with a contractor, but must pull required building permits from their local jurisdiction.
  • Participating contractor requirements. If replacing a heating, ventilating and air conditioning (HVAC) system or installing attic insulation, these projects must be completed by a contractor on IID’s Participating Contractor List, unless the customer is self-installing the product. Visit www.iid.com/ParticipatingContractors to access IID’s Participating Contractors List.
  • Rebate frequency. A customer may only receive a rebate for the same product type once every five years.
  • NEM customers. Net energy metered (self-generating) customers’ rebate amounts will be determined by the percentage of their total energy usage that is not offset by their photovoltaic system. For example, if only 25% of an NEM customer’s energy is supplied by IID, their incentive is reduced to 25% of the rebate amount listed on the application.
  • Building permit requirements. Building permits are a requirement of your local jurisdiction (city, county, etc.) for certain projects, including the replacement of an HVAC system. Failure to apply for a building permit, when one is required, can result in a fine from your local building department. Call your local building department for more information.

Terms and Conditions

  1. I understand that funding is available on a first-come, first-served basis. Funds are limited and rebates are not guaranteed. Applications for rebates totaling $5,000 or more require pre-approval from IID. This program may be modified or terminated without prior notice.
  2. I understand that all measures must be purchased and installed between January 1, 2019, and December 31, 2019.
  3. I understand that the equipment must be new and installed at the address listed on this application prior to submittal of this application. Units that are resold, rebuilt, retrofitted, rented, awarded as a prize, received in full or in part from insurance claims or installed as a result of new construction do not qualify.
  4. I understand that the signed and dated application, copies of receipts, invoices and other supporting documentation must be submitted to the IID Rebate Processing Center no later than December 31, 2019.
  5. I will allow, if requested, reasonable access to my building(s) to verify the installed item(s) noted on this application. I understand that a rebate will not be paid or I will be invoiced for the rebate amount, if I refuse a verification inspection.
  6. I agree that the selection, purchase, installation, ownership and maintenance of the product or improvement listed in this application are my sole responsibility and that my supplier, installer or contractor who provided these products or improvements is not an agent or representative of IID. I also understand that, with respect to the measures I choose to install, IID makes no warranty, whether expressed or implied, including warranty of merchantability or fitness for any particular purpose. I agree that IID has no liability whatsoever concerning (1) the measures I choose to install; and (2) the workmanship of any third parties. I agree that in no event shall IID’s liability for property loss or damage resulting from its activities under this application exceed the total rebate amount paid to me under this application.
  7. I agree to continue using the incentivized equipment for the service life of the product (as per manufacturer’s recommendations) or for five years, whichever is less. If I do not comply with this requirement, I agree that IID has the right to seek a refund for a prorated amount of the original incentive initially paid to me, based on the period of time that I provided the related energy-efficiency benefits.
  8. I understand that the rebate amount per unit will be paid according to the rebate amount per unit in effect at the time the application is received by IID.
  9. If a tenant, I understand I am responsible for obtaining the property owner’s permission to install the product or improvement for which I am applying for a rebate. My signature on this application indicates I have obtained this permission.
  10. I understand that the rebate amount cannot exceed 50% of the net purchase price for the measures to be installed, where the net purchase price is defined as the documented purchase cost less any taxes, shipping, insurance coverage and incentives received from other entities (other than tax credits).
  11. I understand that if I am a self-generating customer my rebate amount will be determined by the percentage of my total energy usage that is provided by IID.
  12. TAX LIABILITY—Rebates and incentives are taxable. You are urged to consult your tax advisor concerning the taxability of rebates. IID is not responsible for any taxes that may be imposed on you as a result of your receipt of this rebate.
  13. I certify that I will comply with all program requirements and with all applicable local, state or federal laws and property owner requirements, if any. In instances when a contractor is required for the installation of the new measure, I understand it is my responsibility to ensure the contractor holds the appropriate license for the work performed.

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer