Cutout Schedule

Print
Press Enter to show all options, press Tab go to next option

The IID Water Department is continually conducting maintenance—both preventative and reactive—of its waterways. With procedures like disking, chaining, cleaning, concrete lining repair, vegetation management, and bank, gate, pipe and road maintenance, the Maintenance Unit keeps the Colorado River water flowing. The Construction Unit is responsible for new canal lining projects, adding pipelines, and all other major repair and additions to IID’s water system included in the annual capital improvement program (CIP). While some procedures can be done while a canal or drain has water in it, much of the work is completed during planned ‘Cut-Out’ periods. For a list of planned canal cutouts, see the schedules posted below.

For more information, contact your local Water Division Office, or the IID Water Construction Unit at: (760) 339-9286.

Current monthly schedule
July 2020 Canal Outages [PDF] Updated 6/2/2020

 

Upcoming schedule
August 2020 Canal Outages [PDF] Updated 7/8/2020
September 2020 Canal Outages [PDF] Updated 7/8/2020
October - No Canal Outages [PDF]
November 2020 Canal Outages [PDF] Updated 7/8/2020
December 2020 Canal Outages [PDF] Updated 7/8/2020

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer